"You have Building Operations and Construction problems?...we have the Solutions"Blog by Hal Finkelstein, This is my Blog to provide information from my various books and seminars, Here I include short write-ups on HVAC, electrical motors, ventilation,Elevators, lighting, electrical cables, concrete, controls and window. building construction problems.
Monday, April 29, 2019
Cooling Towers can Create many Problems
A common building construction problem is when Algae,spores, sand, and other debris can build up in cooling towers to cause fouling of the equipment cooling towers
serve. As the fouling progresses, localized differential corrosion cells begin to form.The
differential corrosion cells cause pitting corrosion to attack the internal areas
of the heat transfer tubes. Hal Finkelstein and team have done a lot of studies on this subject.
As the pitting corrosion progresses and causes wastage of copper
material, copper begins to plate out on the interior surfaces of any steel piping
used.A combination of PH values of six
to seven along with the warm condenser water and the copper plating out on the steel
causes corrosion to progress upon any steel piping utilized in the system. This corrosion process develops tubercle material, which, due
to water velocity, periodically brakes off and can end up in the cooling tower water
circuit.
The iron oxide that enters the cooling tower water circuit begins
to work its way to the heat exchanger tubes, accumulate with the algae, spores,
sand, and etc. and begins to cause increased fouling of the tubes and plates. Hal Finkelsyein's studies of many NYC high rise buildings gave him and his team access to may different solutions..
Water flows and water velocities will begin to severely decrease
and would tend to decrease the effectiveness of cleaning operations. The more the tubes or plates fouled the greater the amount of
differential corrosion cells were produced and the greater the amount of pitting
took place. The more pitting there was, the more copper plated out on the inside
surface of any steel pipe which would begin to cause corrosion of the steel pipe.
Improper selection of Electric Motor starters for energy efficient motors.
For this building construction problem one must understand the difference between "inrush" and
"locked rotor" current.Locked
rotor current is the value which begins at the moment of contact closure.It declines rapidly as the motor accelerates
up to running speed.The dissipation of
locked rotor current takes place in a mere matter of seconds.Locked rotor amperage normally runs between
six to ten times full current.
Inrush
current, which can be up to twenty times the full load current, actually occurs
for approximately a hundredth of a second.Although its value far exceeds the locked rotor amperage, since it
occurs for such a small period of time, it does not affect thermal protectors.However, energy efficient motors utilized
with older magnetic circuit protectors can often experience nuisance starting
trips. Hal Finkelstein has done a lot of research on these motor starter problems. Learn more
TheTracergastechniqueprovidesthemostaccurateand,insomecase,theonlymeansofmeasuringseveralventilationparameterswhicharecriticaltoairbornecontaminationcontrol.Theversatilityoftracergasmethodologypermitsaccurateairflow measurements to be performed in situationsin which Pitot tubes,air velocitymetersortemperaturesensorscannotbeapplied.
The overalltestprocedurerequiredfor this applicationinvolvesdosingtracergasataconstantrateatonepointinthesystemandthenmonitoringthetracerconcentrationatotherpositionsofinterest.
Thetracergassurveyisperformedwithacomputerizedmicroprocessorcontrolledquantitativegasanalyzer.Themeasurementprincipleisbasedonthephotoacousticinfra-reddetectionmethod.Ineffect,thismeansthattheinstrumentcanbeusedtomeasurealmostanygaswhichabsorbsinfra-redlight.Appropriateopticalfiltersareinstalledinthe filter
carouselso that the instrumentcan selectively measuretheconcentrationofupto5differenttracergasesinanyairsamplepass.Thedetectionthresholdisgas-dependentbuttypicallyinthe10-3ppmregion.
Whena protectiveroom
hasitsown dedicatedHVACsystem a tracer gas surveycan bemadeto
seeifyouare
providing the properamount ofHEPAfiltered andadsorption treated air tothe breathinglevel of the occupants.This issomethingthatmustbedoneforCPsystemsthatareto beusedon acontinuousbasses asmay
bedone for schools,governmentbuildingsand somecorporateheadquarterbuildings.
See figures2 and 3for diagrams on howthe
tests are performed,note thatforthesetypesof testsSF6 is
thepreferred tracergas.Followingis a legend ofwhateachvariablein the
figures are.
C1=Concentrationoftracergasinreturnair
C4=Concentrationoftracergasinbreathingzone To learn more purchase my publication PUB #29.
I have over 55 years experience in building construction and solving building construction problems. I have owned construction, engineering and Property management companies. I served as Expert Witness on major construction defect cases across the Nation. In addition I have written 15 engineering/construction books, on topics such as High Pressure Steam Systems, Building HVAC Systems, Building Electrical Systems, Elevators, Concrete problems, Air Contamination, Bio-terrorism, Building Back-up Generation and much more. Books I have written and seminars I have given around the USA, are used by major companies to train their facility engineers and maintenance staff. Close to 3500 corporations around the world use my books to train their facility people. In addition some of my books have been translated into 5 different languages..